
AutoTranslate AI converts floor plan images into 3D data models for accurate material takeoffs.

AutoTranslate AI converts floor plan images into 3D data models for accurate material takeoffs.

Investment targets roof-mounted fans to prevent unplanned stops and fire risks.

The project will include installation, commissioning and operator training, with work scheduled for autumn 2026.

Modernization lifts daily output by 2.5% and cuts energy use by 5%.

The companies ended their 20-year cooperation amicably and will complete ongoing projects together.

The proposal would reorganize procurement rules, remove nonessential requirements, consolidate security provisions, and shift guidance to nonregulatory resources.

A continuous line with a new press, an emission-control system and a digital platform will replace three older presses and is scheduled to enter production in summer 2027.

Project replaces cast-iron Yankee dryer with new-generation steel unit to reduce energy use.

Intelligent Vision Platform combines deep learning with real-time image analysis to classify each wood surface.

The project will replace the site's last third-party control system with a web-based distributed control system, include a DNAe historian and HIMA-based safety systems, and the customer will take over delivery in the first quarter of 2027.

The firm will design wooden structures, while Hill International will consolidate project management.

China's construction crisis and higher logistics costs have cut shipments, while Russia's downgraded economic outlook limits domestic absorption of growing supply.

Stationary unit targets 2027 startup to lower energy use and enable kiln capacity increase.

Crystallization system targets extended recovery boiler maintenance intervals beyond 24 months.

Decades-old Finnish-Japanese trading firm brings local networks as Japan's sawmill industry automates production lines.

Modernization targets wider containerboard grade portfolio and basis weight range.

Equipment delivery and commissioning scheduled for summer 2026.

Installation marks a step forward in scanning precision and log recovery optimization

The builder cited affordability concerns and competitive conditions, and said it adjusted incentives, sales pace and production while working down spec inventory.

Investment targets increased machine availability and more effective maintenance planning within scheduled shutdown windows.