
Private new single-family construction fell 0.1% from April, while public construction spending was estimated 0.5% higher.

Private new single-family construction fell 0.1% from April, while public construction spending was estimated 0.5% higher.

$77 million facility doubles production capacity for Surestone decking and adds 50 full-time jobs.

48,000 m2 facility features fully automated panel storage and plus-energy building design.

National survey finds stable ownership patterns, with fewer owners harvesting timber, lower concern about wildfire and higher participation in property tax, conservation easement and green certification programs.

Investment removes downstream bottlenecks and supports push toward 450,000 m3 annual output.

Investment program eliminates production bottlenecks as sawmill processes 1.35 million m3 of roundwood annually.

New site adds 260 employees and expands luxury packaging production for beauty and premium drinks sectors.

Total investment reaches $29 million with 3 million case capacity, production starting in Q4 2026.

$90 million investment brings 100 new jobs to Rockwall Technology Park campus.

The company will invest Euro 19 million in upgrades to increase fluff capacity to 440 thousand tons annually, with the project due to complete in the fourth quarter of 2027.

A continuous line with a new press, an emission-control system and a digital platform will replace three older presses and is scheduled to enter production in summer 2027.

Biomass boiler replacement eliminates natural gas usage at 400 thousand m3 per year Irish plant.

Fully automated facility with AI and robotics produces more than 4.5 million square metres of Sonablock acoustic panels annually.

The project will assess converting industrial-grade logs into fully fitted mass timber modules for hotels, housing and offices.

The first operation outside Brazil will use local pine to make finished export goods and will start with 150 employees, rising to more than 400 at full development.

The rebuilt mill will be capable of producing up to 90 million board feet annually.

The $5.3 million project will add a 30,000-square-foot building, install a thermal-treating kiln and a double-bladed bandsaw, and is expected to boost log purchases and product output.

France-first industrial installation replaces part of gas demand with low-carbon electricity since commercial start.

The expansion is backed by approximately $42 million in CDE investments, unlocking up to $16.5 million in tax credits and increasing employment from 140 to about 220 full-time equivalent positions.